We won this contract with the Illinois Department of Natural Resources to improve the North Point Marina. The marina was clogged with sand that migrated through the stone breakwater. Using a crane with a clam shell bucket we dredged the sand and reinforced the breakwater by placing additional quartzite stone. Because of the low water level we extended the boat launch ramps.